Sabra I- Development

  • Building of 810 units of affordable Housing including 87 shops.
  • Building of 17,250 m2 of underground / semi- recessed parkings ( 690 parking space ).
  • Building of 12,500 m2 of workshops.
  • Building of 5,000 m2 of underground parking for workshops area.
  • Project to start between July and September 98.
  • Expected Completion between 24 to 30 months.
  • Total Built up area 104,500 m2.
  • Project Total Land Area 51,000 m2.
  • Project includes execution of infrastructure works and utility lines in addition to the local road network.
Details of the Housing program
     Total Built Up Area = 92,000 m2.

Land Use Distribution:
     34 % Residential & Commercial Uses
     4 % Local Roads
     61 % Open Spaces, Walkways & Gardens
     1 % Surface Parking

Housing Program:
     14 % dedicated for 4BDRM at an Average
     area of 140 m2.
     43 % dedicated for 3BDRM at an Average
     area of 125 m2.
     43% dedicated for 2BDRM at an Average
     area of 95 m
Details of the Workshops program
     Total Built Up Area = 12,500 m2 .

Land Use Distribution:
     48 % Workshops
     35 % Roads
     17 % Surface Parking

Development Program:
     3,800 m2 of ground floor workshops
     3,700 m2 of first floor workshops

All necessary engineering and technical documents will be made available upon request.

Phase Phase2 Phase3