Maramel I- Development
- Building of 1,440 units
of affordable Housing including190 shops.
- Building of 200
workshops.
- Project to start
between August and September of 1998.
- Expected Completion
between 24 to 30 months.
- Total Built up Area
165,000 m2 .
- Project total Land Area
130,000 m2 .
- Site preparation
includes 1,100,000 m3 of excavation works.
- Project includes
execution of infrastructure works and utility lines in
addition to the local road network.
Details
of the Housing program Total
Built Up Area = 150,000 m2 .
Land Use
Distribution: 27,5 %
Residential & Commercial Uses 16.0
% Local Roads 34.5 % Open
Spaces, Walkways & Gardens 22.0
% Surface Parking
Housing Program: 10
% dedicated for 4BDRM at an Average area
of 135 m2. 43 % dedicated
for 3BDRM at an Average area
of 120 m2. 47% dedicated
for 2BDRM at an Average area
of 95 m |
|
Details
of the Workshops program Total
Built Up Area = 15,000 m2 .
Land Use Distribution: 50
% Workshops 20 % Roads
30 % Surface Parking
Development Program: 7,500
m2 of ground floor workshops 7,500
m2 of first floor workshops |
All necessary engineering
and technical documents will be made available upon request.
|
|