Maramel I- Development

  • Building of 1,440 units of affordable Housing including190 shops.
  • Building of 200 workshops.
  • Project to start between August and September of 1998.
  • Expected Completion between 24 to 30 months.
  • Total Built up Area 165,000 m2 .
  • Project total Land Area 130,000 m2 .
  • Site preparation includes 1,100,000 m3 of excavation works.
  • Project includes execution of infrastructure works and utility lines in addition to the local road network.
Details of the Housing program
     Total Built Up Area = 150,000 m2 .

Land Use Distribution:
     27,5 % Residential & Commercial Uses
     16.0 % Local Roads
     34.5 % Open Spaces, Walkways & Gardens
     22.0 % Surface Parking

Housing Program:
     10 % dedicated for 4BDRM at an Average
     area of 135 m2.
     43 % dedicated for 3BDRM at an Average
     area of 120 m2.
     47% dedicated for 2BDRM at an Average
     area of 95 m
Details of the Workshops program
     Total Built Up Area = 15,000 m2 .

Land Use Distribution:
     50 % Workshops
     20 % Roads
     30 % Surface Parking

Development Program:
     7,500 m2 of ground floor workshops
     7,500 m2 of first floor workshops

All necessary engineering and technical documents will be made available upon request.

Phase Phase2 Phase3