PHASE II (year 5 to 7)

  • Build 975 residential units, 135 shops and 200 workshops in AL-Maramel (M2).
  • Build 1275 residential units, 135 shops in Horch~Al~Katil (HK1).
  • Build 260 residential units, 49 shops in Sabra~Chatila (SA3.1,SA5).
  • Construct the Ouzai~Riad El Solh road extension into Sabra~Chatila.
  • Reclaim land and construct Ouzai Corniche.
  • Install new infrastructure in Jnah (J1+J2+J3+J4), Hay Al~Zahra and Raml Al~Aali.
  • Upgrade existing infrastructure in Horch Al~Katil (HK5+HK6).
Phase Phase2 Phase3