PHASE II (year 5 to 7)
Build 975 residential units, 135 shops and 200 workshops in AL-Maramel (M2).
Build 1275 residential units, 135 shops in Horch~Al~Katil (HK1).
Build 260 residential units, 49 shops in Sabra~Chatila (SA3.1,SA5).
Construct the Ouzai~Riad El Solh road extension into Sabra~Chatila.
Reclaim land and construct Ouzai Corniche.
Install new infrastructure in Jnah (J1+J2+J3+J4), Hay Al~Zahra and Raml Al~Aali.
Upgrade existing infrastructure in Horch Al~Katil (HK5+HK6).